PORT ORCHARD — Kitsap County commissioners voted 3-0 on Monday, Nov. 23, to approve reopening Northeast Gluds Pond Street at Brownsville Highway, but county officials said the road likely won’t open until late February at the earliest.
The resolution doesn’t open the street on its own. It stays closed until Public Works inspects and accepts a right-turn-only exit onto southbound Brownsville Highway, and until the Department of Community Development issues the first certificate of occupancy for either the Gluds Pond Apartments or Royal Valley Plat Phase 1. Drivers won’t be able to turn onto Gluds Pond Street from Brownsville Highway.
Commissioner Christine Rolfes asked when that could happen, noting it had been reported that the road would open as soon as the resolution passed.
“Best case would be, based on conversations with the developer on where they are … on the apartments, would be late February, and that’s if they ask for a temporary certificate of occupancy,” said Community Development Director Rafe Wysham. If the developer needs a full certificate, he said, “it probably is later than that.”
The resolution also requires Public Works to notify Gluds Pond Street residents at least seven days before the road reopens, and says the board will reconsider it if county staff decide different traffic restrictions are needed.
Why right turns only
Interim County Engineer Michelle Filley said the street is being rebuilt to county road standards and won’t open until that work is done. Limiting the Brownsville Highway end to right turns out cuts down on left turns, which she said are “very problematic for collisions.”
Wysham said a study of the two years before the county closed the street in 2002 found 17 crashes tied to Gluds Pond, and 15 of them involved drivers turning left off state Route 303 onto Gluds Pond. That turn won’t be allowed. The 303 end will also be right-in, right-out.
Neighbors object
Three people urged the board to hold off. Kathy Lustig of East Bremerton said she had given commissioners excerpts of about 2,500 pages of emails between Public Works and Rush Development, obtained through public records requests, and that the resolution was “not fully factual and missing key elements.” She said the emails show the reopening was approved in 2024 as a condition of a site development permit, described only in vague terms such as “frontage improvements.”
Mandy Owens of Bremerton said she and her neighbors were never notified by DCD that the street would become an exit for the Royal Valley development or consulted about a 2022 agreement among the developer, the state Department of Transportation and county Public Works. “The only reason this resolution was brought to your attention was because taxpaying citizens found it in the county records,” she said.
Joe Lubischer of Indianola, commenting online, said sight distances at the intersection are too short for trucks and trailers and asked whether the county would close the street to trucks.
Board: ‘uncomfortable’
Rolfes made the motion and Commissioner Katie Walters seconded it. Rolfes said the traffic analysis by Public Works and the state shows it is “one of the safest ways” in and out of the new development. “This whole situation has been uncomfortable, but here we are,” she said.
Walters said the county is continuing to press WSDOT on the whole state Route 303 corridor, not just Gluds Pond. Chair Oran Root said the vote moves the county forward “not to open Gluds Pond, but to keep working on it.”
Commissioners postponed the vote Nov. 9 to look more closely at residents’ safety and notice concerns.

Leave a Reply